Scheduled Inspection Requests

These are the scheduled inspections.

You can save a copy by selecting all (Ctrl A) and paste into Excel (Ctrl V).

You can also print this page File > Print (Ctrl P).

Date
Time
Company
Inspection Type
Inspection Notes
QC Contact
QC Phone
Facility No
Location
Detailed Location
Assignee
Cancelled
03/22/2025
0800
Harper Bros
Field Density/Compaction/Subgrade
Compaction
Paul Hernandez
8325401585
025 Site Civil
Site Civil
North Tunnel
James M
03/22/2025
0800
Harper Bros
Visual (VT)/CWI Inspection
Welding
Paul Hernandez
8325401585
025 Site Civil
Site Civil
North Tunnel
James M
03/21/2025
0800
Harper Bros
Field Density/Compaction/Subgrade
Compaction
Paul Hernandez
8325401585
025 Site Civil
Site Civil
North Tunnel
James M
03/21/2025
0800
Harper Bros
Visual (VT)/CWI Inspection
Welding
Paul Hernandez
8325401585
025 Site Civil
Site Civil
North Tunnel
James M
03/20/2025
0730
Balfour Beatty
Hydrostatic/Pneumatic Pressure Chlorine Residual Test
Pneumatic test for the 1.5"~1" NG line - test for 8 hours
Saif
8323357393
202 Chloride Dioxide Facility 2
North Plant
202
Oznel G
03/20/2025
0745
HWT
Visual/Ambient Verification
Verification of ambient conditions at High Service Pumps for 2nd coat by PCI.
Oznel Garza
956-240-5304
402 High Service Pump Station 2
South Plant
Inside HSPS
Oznel G
03/20/2025
0800
Harper Bros
Visual (VT)/CWI Inspection
Welding
Paul Hernandez
8325401585
025 Site Civil
Site Civil
North Tunnel
James M
03/20/2025
0800
Harper Bros
Field Density/Compaction/Subgrade
Compaction
Paul Hernandez
8325401585
025 Site Civil
Site Civil
North Tunnel
James M
03/20/2025
0800
Balfour Beatty
Visual Inspection - Add Notes
Paint Doors, valve gear box, and gas line.
mhoy
281-865-8418
262 Ozone Generation Facility 2
North Plant
Outside doors and gas line and gear box inside main room
Milind C
03/20/2025
0830
Balfour Beatty
Visual Inspection - Add Notes
Paint vault piping
mhoy
281-865-8418
243 Flocculation and Sedimentation Train 3
North Plant
East side
Oznel G
03/20/2025
0900
Balfour Beatty
Visual Inspection - Add Notes
Paint PDR piping
mhoy
281-865-8418
254 Ozone Contractor 4
North Plant
Southeast corner of building
Milind C
03/20/2025
0900
Balfour Beatty
Electrical 4 - Ground Resistance/High Potential
Visual Ground Inspection
Warren Davis
832-373-5796
612 Liquid Residuals Clarifier Facility 2
North Plant
North Side
Robert J
03/20/2025
0900
Balfour Beatty
Holiday
Final holiday test for Clarified rake arm.
mhoy
281-865-8418
504 Gravity Sludge Thickener Complex 4
North Plant
GT-7
Oznel G
03/20/2025
0930
PLW
Visual/Surface/Ambient Verification
Verification of surface prep and ambient conditions on 60" Flap Gate Valve and flange by BAMEX.
Marcos Gonzalez
Yard Pipe
North Plant
Pond 7
Oznel G
03/20/2025
1000
Harper Bros
Cathodic Protection
Cathodic Lead Testing
Paul Hernandez
8325401585
025 Site Civil
Site Civil
North Tunnel
Robert J
03/20/2025
1000
Balfour Beatty
Holiday
Final holiday test on Influent wall and steel.
mhoy
281-865-8418
504 Gravity Sludge Thickener Complex 4
North Plant
GT-8
Oznel G
03/20/2025
1000
J. Simmons Group, Inc.
Concrete Sampling
30cy D222202
Victoria
2812212915
025 Site Civil
Site Civil
261 LOX step, 202 North, 243 West sidewalk, 503 North sidewalk, 252 valley
Milind C
03/20/2025
1330
Balfour Beatty
Electrical 4 - Ground Resistance/High Potential
Visual Ground Inspection
Warren Davis
832-373-5796
243 Flocculation and Sedimentation Train 3
North Plant
West Side
Robert J
03/20/2025
929
Balfour Beatty
Electrical Equipment Torquing
Torque LCP 100
Warren Davis
832-373-5796
223 Rapid Mix Train 3
North Plant
North Wall
Robert J
03/19/2025
1300
Balfour Beatty
Electrical 4 - Ground Resistance/High Potential
Visual Ground Inspection
Warren Davis
832-373-5796
612 Liquid Residuals Clarifier Facility 2
North Plant
East Side
Clay Saldana
03/19/2025
1300
Balfour Beatty
Visual Inspection - Add Notes
Basin Walk
Poonam
8329779803
503 Gravity Sludge Thickener Complex 3
North Plant
503 USDS
03/18/2025
1100
Fisk
Electrical 2 - Ductbank/Exterior
Trench Base
Warren Davis
832-373-5796
045 Site Electrical
Site Electrical / I&C / Security
Call When Needed
Robert J
03/14/2025
0930
Balfour Beatty
Electrical Equipment Torquing
Torque PND, ASD, MCP, LCP, ETC.
Warren Davis
832-373-5796
202 Chloride Dioxide Facility 2
North Plant
Electrical Room
Clay S
03/14/2025
10
Industrial TX
Visual (VT)/CWI Inspection
Finish coat on the concrete barrier bollards - All day
Edwin P
8324984994
075 Main Entrance Guard House
Site Civil
Guardhouse
03/14/2025
10
Industrial TX
Drilling/Doweling/Epoxy/Pull Test
Drilling min 6" for Bollards / Epoxy and SS 7/8" threaded bolts
Edwin P
8324984994
075 Main Entrance Guard House
Site Civil
Guardhouse
03/13/2025
1000
Balfour Beatty
Visual Inspection - Add Notes
Basin inspection
Poonam
832-335-7393
504 Gravity Sludge Thickener Complex 4
North Plant
504 USDS
03/13/2025
9
Industrial TX
Visual (VT)/CWI Inspection
Concrete barrier bollards - Continue putting the first coat on them - All day long
Edwin Pena
8324984994
075 Main Entrance Guard House
Site Civil
Guardhouse
Damon O
03/10/2025
1000
Balfour Beatty
Visual Inspection - Add Notes
612 Basin inspection
Poonam
8329779803
612 Liquid Residuals Clarifier Facility 2
North Plant
612 Clarifed Recycle Pump Station
Damon O
02/27/2025
1100
Balfour Beatty
Visual Inspection - Add Notes
Chain and flight 200 hours run test - Day #8 ( final)
Saif
8323357393
612 Liquid Residuals Clarifier Facility 2
North Plant
612
02/27/2025
1100
Balfour Beatty
Visual Inspection - Add Notes
Chain and flight 200 hours run test - Day #8 (Final)
Saif
8323357393
243 Flocculation and Sedimentation Train 3
North Plant
243 Basin #6
02/27/2025
1100
Balfour Beatty
Visual Inspection - Add Notes
Chain and flight 200 hours run test - Day #7
Saif
8323357393
612 Liquid Residuals Clarifier Facility 2
North Plant
612
02/26/2025
1100
Balfour Beatty
Visual Inspection - Add Notes
Chain and flight 200 hours run test - Day #7
Saif
8323357393
243 Flocculation and Sedimentation Train 3
North Plant
243 Basin #6
02/26/2025
1100
Balfour Beatty
Visual Inspection - Add Notes
Chain and flight 200 hours run test - Day #7
Saif
8323357393
612 Liquid Residuals Clarifier Facility 2
North Plant
612
02/25/2025
0800
Balfour Beatty
Visual Inspection - Add Notes
Paint 24" ductile
mhoy
281-865-8418
504 Gravity Sludge Thickener Complex 4
North Plant
North side at USDS
02/25/2025
0830
Balfour Beatty
Visual Inspection - Add Notes
Paint ductile
mhoy
281-865-8418
802 Basin Drain Pump Station 2
North Plant
Inside
02/25/2025
0900
Balfour Beatty
Visual Inspection - Add Notes
Paint PVC piping
mhoy
281-865-8418
202 Chloride Dioxide Facility 2
North Plant
Inside building main room
02/25/2025
0930
Balfour Beatty
Visual Inspection - Add Notes
Paint PVC piping
mhoy
281-865-8418
216 Pretreatment Chemical Facility 6
North Plant
Inside main room
02/25/2025
1000
Balfour Beatty
Visual Inspection - Add Notes
Deficiency Tracker Item - J Hook Sealant Fix
Zach R
8329752802
218 Pretreatment Chemical Facility 8
North Plant
218 - PC Tanks
02/25/2025
1000
Balfour Beatty
Visual Inspection - Add Notes
Final paint inspection on PPW piping before piping gets insulated.
mhoy
281-865-8418
217 Pretreatment Chemical Facility 7
North Plant
North road
02/25/2025
1030
Balfour Beatty
Visual Inspection - Add Notes
Paint PEN line
mhoy
281-865-8418
243 Flocculation and Sedimentation Train 3
North Plant
Rooftop
02/25/2025
1100
Balfour Beatty
Visual Inspection - Add Notes
Paint PEN line
mhoy
281-865-4818
244 Flocculation and Sedimentation Train 4
North Plant
Roof top
02/25/2025
1100
Balfour Beatty
Visual Inspection - Add Notes
Chain and flight 200 hours run test - Day #6
Saif
8323357393
612 Liquid Residuals Clarifier Facility 2
North Plant
612
02/25/2025
1100
Balfour Beatty
Visual Inspection - Add Notes
Chain and flight 200 hours run test - Day #6
Saif
8323357393
243 Flocculation and Sedimentation Train 3
North Plant
243 Basin #6
02/25/2025
1130
Balfour Beatty
Visual Inspection - Add Notes
Paint 8" CDS on roof top
mhoy
281-865-8418
223 Rapid Mix Train 3
North Plant
Roof top
02/25/2025
900
HWT
Visual Inspection - Add Notes
Coating inside valve box
Abdul Masoom
N/A
251 Ozone Contractor 1
North Plant
South side valve box
02/25/2025
900
HWT
Visual Inspection - Add Notes
Coating inspections of bellows
Abdul Masoom
N/A
402 HSPS 2
South Plant
402 Bellows South side exterior
02/24/2025
0800
Balfour Beatty
Visual Inspection - Add Notes
Paint ductile piping.
mhoy
281-865-8418
802 Basin Drain Pump Station 2
North Plant
Inside
02/24/2025
0830
Balfour Beatty
Visual Inspection - Add Notes
Paint carbon Steel piping.
mhoy
281-865-8418
262 Ozone Generation Facility 2
North Plant
Main room
02/24/2025
0900
Balfour Beatty
Visual Inspection - Add Notes
Repair 1 holiday
mhoy
281-865-8418
504 Gravity Sludge Thickener Complex 4
North Plant
GT-8
02/24/2025
0900
Balfour Beatty
Visual Inspection - Add Notes
Paint PVC piping
mhoy
281-865-8418
216 Pretreatment Chemical Facility 6
North Plant
Main room
02/24/2025
1100
Balfour Beatty
Visual Inspection - Add Notes
Chain and flight 200 hours run test - Day #5
Saif
8323357393
612 Liquid Residuals Clarifier Facility 2
North Plant
612
02/24/2025
1100
Balfour Beatty
Visual Inspection - Add Notes
Chain and flight 200 hours run test - Day #5
Saif
8323357393
243 Flocculation and Sedimentation Train 3
North Plant
243 Basin #6
02/22/2025
0800
Balfour Beatty
Visual Inspection - Add Notes
Paint carbon steel piping
mhoy
281-865-8418
262 Ozone Generation Facility 2
North Plant
Inside main room
02/22/2025
0830
Balfour Beatty
Visual Inspection - Add Notes
Paint PVC piping
mhoy
281-865-8418
216 Pretreatment Chemical Facility 6
North Plant
Inside main room
02/22/2025
1100
Balfour Beatty
Visual Inspection - Add Notes
Chain and flight 200 hours run test - Day #3
Mike
8323357393
243 Flocculation and Sedimentation Train 3
North Plant
243 Basin #6
02/22/2025
1100
Balfour Beatty
Visual Inspection - Add Notes
Chain and flight 200 hours run test - Day #3
Mike
8323357393
612 Liquid Residuals Clarifier Facility 2
North Plant
612
02/13/2025
0500
J. Simmons Group, Inc.
Concrete Sampling
Road 9 and pour back demo at 221/D222202 7" slump
Victoria
2812212915
025 Site Civil
Site Civil
Road 9 and pour back demo at 221
02/12/2025
1550
J. Simmons Group, Inc.
Closed Form/Pour Card Inspection
Road 9 and pour back demo at 221
Victoria
2812212915
025 Site Civil
Site Civil
Road 9 and pour back demo at 221
02/07/2025
1000
Balfour Beatty
Visual Inspection - Add Notes
Visual inspection for Basin 6
Poonam
8329779803
243 Flocculation and Sedimentation Train 3
North Plant
243 basin #6
02/06/2025
0830
Balfour Beatty
Visual Inspection - Add Notes
Paint PDR piping inside
mhoy
281-865-8418
253 Ozone Contractor 3
North Plant
Roof top
Oznel
02/05/2025
11.00
Pepper Lawson - YP
Closed Form/Pour Card Inspection
none
Troy Continenetal
979-777-1979
035 Site Yard Piping
Yard Piping
road-trench mow strip pond 8-9
02/05/2025
14.00
Pepper Lawson - YP
Concrete Sampling
none
Troy Continental
979-777-1979
035 Site Yard Piping
Yard Piping
road-mow strip trench pond 8-9
08/30/2024
1000
Balfour Beatty
Visual Inspection - Add Notes
Concrete Surface Finish
Zach R
832.975.2802
254 Ozone Contractor 4
North Plant
254 - South Exterior Wall
Dan N
08/09/2024
1300
Balfour Beatty
Electrical 4 - Ground Resistance/High Potential
resistance test.
Warren Davis
832-373-5796
215 Pretreatment Chemical Facility 5
North Plant
North West corner of 215
Robert J
07/20/2024
1000
Balfour Beatty
Water Tightness/Static Head/Leak
NO INSPECTION - Leak test day #3 (SOAK)
Saif
8323357393
802 Basin Drain Pump Station 2
North Plant
802
07/19/2024
1000
Balfour Beatty
Water Tightness/Static Head/Leak
NO INSPECTION - Leak test day #2 (SOAK)
Saif
8323357393
802 Basin Drain Pump Station 2
North Plant
802
07/19/2024
1100
Balfour Beatty
Visual Inspection - Add Notes
Concrete Surface Finish
Zach R
8329752802
244 Flocculation and Sedimentation Train 4
North Plant
244 - Basin 8 Floc Basin: North Interior
Larry C
07/18/2024
0900
Balfour Beatty
Visual Inspection - Add Notes
Concrete Surface Finish Sign Off
Zach R
832.975.2802
244 Flocculation and Sedimentation Train 4
North Plant
244 - Basin 8 Floc: North Interior Wall
Dan N